Are there any guarantees on Ranbuild buildings?

All Ranbuild buildings are designed in accordance with the Standards Association of Australia building codes and come with up to 15 years BlueScope Steel warranty on framing and cladding.

Why choose a Ranbuild shed?

With 55 years experience and as a foundation member of the steel shed industry you can be assured that all our designs are of the highest standard. The use of only quality materials and rigorous testing will ensure your shed not only looks good but will withstand the toughest conditions.

Destruction testing confirms our engineer’s calculations and sets the safety margins for components and buildings alike.

Every test is carefully recorded. Angles, braces, cleats and members are all subject to the same pressure. The results are then analysed and final recommendations are given.

This series of base plates have just completed tests for up-lift and horizontal deflection. As you can see, they weren’t destroyed; even after applying three times the design load the plates never budged.

The Ranbuild infinite test bed allows us to apply loads to structural members representing both live and dead loads. Ranbuild test all new sections and designs in a similar manner. The tests and resulting data are usually far more accurate and more comprehensive than information supplied by the original manufacturer. These are just a sample of tests Ranbuild carry out to ensure quality.

What is Ranbuild Buy Now Pay Later?

Ranbuild have teamed up with Skye to offer you 6 months Interest Free* on all shed quotes from participating Ranbuild dealers nationwide. Click here to find out more.

Do I need approval to construct a ranbuild building?

In most cases, the answer is yes. Ranbuild buildings are designed to meet the relevant building codes and full engineering documentation will be provided. On receipt of a deposit and signed order, these documents will be prepared for issue. Ranbuild’s design and engineering is constantly cross checked with the current building code requirements. You can be assured that Ranbuild buildings will meet the demands of local building authorities.

What if I need to obtain council approval before I build?

You can still place your order with a nominal deposit of 10% of the purchase price allowing us to:

  • release the Engineering Plans and Specifications for you to submit to Council for approval
  • provisionally place your building into our production schedule.

How do I pay a deposit?

After your tax invoice has been raised you can pay by cash, cheque, direct deposit, EFTPOS or major credit card. Please note – an applicable credit cards surcharge will apply.